Structural maintenance of concrete roads: replacement of concrete slabs on the A1 West Motorway – a Case Study
Abstract
Common problems on motorways with concrete pavements include edge chipping along the edges of the concrete slabs, damaged pavement transitions (joint damage), reduced skid resistance, cracking and concrete slab migration or subsidence. To effectively repair these damages, concrete pavement rehabilitation works are carried out during periods of low usage, such as weekends and/or during night hours. During these periods, the concrete pavement will be rehabilitated in sections on individual lanes while traffic is routed on the remaining lanes.
Downloads
Copyright (c) 2025 Journal of Road and Traffic Engineering

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License CC BY-NC that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
